What Does a Kitchen Extension Cost?
In London, roughly £2,800 to £5,500 per square metre for the shell, before the kitchen goes in. A typical side return lands between £70,000 and £120,000 all in. A simple knock through between two rooms is a fraction of that.
A kitchen extension in London costs roughly £2,800 to £3,100 per square metre at a basic specification, £3,100 to £4,200 mid range and £4,300 to £5,500 or more at the high end, for the building shell. A typical side return extension totals £70,000 to £120,000 once professional fees, party wall surveyors, building control and VAT are included, before any cabinetry. A simple knock through between two existing rooms is far cheaper at around £3,000 to £10,000 depending on the steel required.
Cost by extension type
The word extension covers everything from removing an internal wall to building a wraparound. The figures differ enormously, so it is worth being clear which one you mean.
| Type | What it is | Typical London cost | Time on site |
|---|---|---|---|
| Internal knock through | Removing a wall between two existing rooms | £3,000 to £10,000 | 2 to 4 weeks |
| Small rear extension | Extending 3m into the garden | £45,000 to £75,000 | 8 to 12 weeks |
| Side return | Filling in the alley beside a terrace | £70,000 to £120,000 | 10 to 16 weeks |
| Full width rear extension | Across the whole back of the house | £80,000 to £140,000 | 12 to 18 weeks |
| Wraparound | Side return plus rear extension combined | £120,000 to £200,000 | 16 to 24 weeks |
Those are shell figures with basic finishes. They exclude the kitchen itself, which for a bespoke fit out adds another thirty five thousand upwards, as set out in How Much Does a Bespoke Kitchen Cost.
Where the money goes
The build cost is only part of the number. The items below are routinely left out of early estimates and account for a large share of the final figure.
| Item | Typical cost | Note |
|---|---|---|
| Professional fees | 10 to 20 per cent of build cost | Architect, structural engineer, project management |
| Planning application | About £550 | Only if permitted development does not cover it |
| Structural engineer and steel | £1,800 to £5,500 | A single beam. A goalpost frame is £6,000 to £12,000 |
| Party wall surveyors | £3,000 to £7,200 | Almost unavoidable in a terrace |
| Building control | £600 to £1,200 | Local authority or approved inspector |
| Roof lantern or rooflights | £1,500 to £5,000 each | The single biggest visual upgrade in a side return |
| Aluminium bifold or sliding doors | £3,150 to £7,200 | Sliding doors usually cost more than bifolds |
| VAT | 20 per cent on the whole project | Extensions are not zero rated |
Extensions to an existing dwelling carry VAT at twenty per cent on labour and materials. On a hundred thousand pound project that is well over sixteen thousand pounds of the total. Check whether a quotation you are comparing is stated including or excluding VAT, because builders differ on this and the gap is enormous.
Do you need planning permission?
Often not, though the exceptions matter a great deal in North London. Many single storey rear and side extensions fall under permitted development, which means no planning application is needed provided the limits are met.
| Limit | Terraced or semi detached | Detached |
|---|---|---|
| Rear depth, standard | 3 metres | 4 metres |
| Rear depth, with prior approval | 6 metres | 8 metres |
| Maximum height | 4 metres | 4 metres |
| Eaves height within 2m of a boundary | 3 metres | 3 metres |
| Side extension width | Half the width of the original house | Half the width of the original house |
| Side extension storeys | Single storey only | Single storey only |
All measurements are taken from the original house as it was built or as it stood in 1948, not from the house as it is now. A previous owner's extension counts against your allowance.
The bigger catch in North London is that permitted development rights are frequently removed. Conservation areas cover large parts of Islington, Hackney, Haringey and Barnet. Many boroughs also have Article 4 directions that withdraw permitted development entirely. Flats and maisonettes never have permitted development rights for extensions at all. Check with the local planning authority before assuming anything.
Building regulations approval is separate and always required, whether or not planning permission is. So is the Party Wall Act, if you are building on or near a shared boundary, which in a terrace you almost always are.
Kitchens designed alongside the building work
We draw the kitchen from architect plans while the extension is still being built, so only the final survey waits for the room to be finished. That saves four to six weeks on most projects across Islington, Hackney, Barnet, Haringey, Enfield and Walthamstow.
How much does a kitchen extension add?
This is the one part of a kitchen project where the money can genuinely come back, because you are adding floor area rather than changing how a room looks.
Side returns commonly add fifty to a hundred thousand pounds to a London terraced house, which on a good street can exceed what the work cost. That is unusual among home improvements and it is why side returns are so common in this part of London.
The caution is the street ceiling. Every road has a price above which buyers move elsewhere. No amount of extending lifts a house past it. If similar extended houses nearby are selling at a level barely above yours unextended, the arithmetic does not work. Talk to two local agents before you talk to a builder. The wider resale picture is in Does a New Kitchen Add Value to a House.
How much to knock through a kitchen diner?
Removing an internal wall between a kitchen and a dining room is the cheapest way to change how a house feels. It is often overlooked in favour of a full extension.
| Item | Typical cost | Note |
|---|---|---|
| Structural calculations | £500 to £1,200 | A structural engineer must specify the beam |
| Steel beam supply and install | £1,500 to £4,000 | Depends on span and whether it is load bearing |
| Building control | £400 to £900 | Always required for a structural opening |
| Making good and plastering | £800 to £2,000 | Both rooms need finishing after |
| Flooring to match across both | £800 to £3,000 | Rarely matches, so often both get replaced |
| Electrical alterations | £400 to £1,200 | Sockets and lighting on the removed wall |
| Total | £3,000 to £10,000 | Two to four weeks on site |
For between three and ten thousand pounds you can double the apparent size of a kitchen, which compares very favourably with seventy thousand for a side return. If the house already has the floor area and it is simply in the wrong arrangement, this is usually the better decision.
The trade off is acoustics and cooking smells, which is what the next question addresses. Zoning an open plan room properly is covered in What Is a Galley Kitchen.
Sequencing the kitchen with the build
The most common and most expensive mistake is treating the kitchen as something that happens after the building work. It should run alongside it.
- Bring the kitchen designer in at plan stage. Where the sink goes decides where the drainage runs go, which has to be known before the floor slab.
- Fix appliance positions before first fix. Ducting for extraction is far cheaper to build in than to retrofit.
- Agree the finished floor level early. Worktop height is measured from finished floor, not from the slab.
- Design the kitchen from architect drawings. Concept work can happen during the build, so only the final technical survey waits.
- Survey only when the room is finished. Plastered, level and dry. A survey taken early produces cabinets that do not fit.
- Allow for the workshop lead time. Eight to twelve weeks of manufacture starts after that survey, not before.
Getting this right saves four to six weeks on almost every extension project. Getting it wrong means the extension sits finished and empty while the kitchen is made. The full programme is in How Long Does a Bespoke Kitchen Take.
Plan the build and the kitchen together
Costs, timescales, layouts, worktops, lighting and materials, written for people commissioning a kitchen rather than buying one. Everything sits in our Bespoke Kitchen Guides library.
Frequently asked questions
How much does a kitchen extension cost?
In London, roughly £2,800 to £3,100 per square metre at a basic specification, £3,100 to £4,200 mid range and £4,300 to £5,500 or more at the high end for the shell. A typical side return totals £70,000 to £120,000 including professional fees, party wall surveyors, building control and VAT, before the kitchen itself.
Do you need planning permission for a kitchen extension?
Often not. Single storey rear extensions usually fall under permitted development up to 3 metres on a terraced or semi detached house and up to 4 metres on a detached house, rising to 6 and 8 metres with prior approval. Conservation areas and Article 4 directions remove those rights across much of North London. Flats never have them at all. Building regulations approval is always required.
How much does a kitchen extension add to house value?
A side return commonly adds £50,000 to £100,000 to a London terraced house, which on a good street can exceed what the work cost. An open plan kitchen diner is credited with a further two to four per cent. The limit is the street ceiling, since no amount of extending lifts a house past the price at which buyers move to a different road.
How much does it cost to knock through a kitchen diner?
Between £3,000 and £10,000 in total, taking two to four weeks on site. That covers structural calculations at £500 to £1,200, the steel beam at £1,500 to £4,000, building control at £400 to £900, plus making good, flooring and electrical alterations. It is the cheapest way to change how a house feels.
Is VAT charged on a kitchen extension?
Yes, at twenty per cent on labour and materials, because extensions to an existing dwelling are not zero rated. On a £100,000 project that is over £16,000. Always check whether a quotation is stated including or excluding VAT before comparing it with another, since builders differ in how they present it.
How long does a kitchen extension take?
Most side returns take ten to sixteen weeks on site, with a full width rear extension twelve to eighteen weeks and a wraparound sixteen to twenty four. Add design, planning and party wall procedures before that, then eight to twelve weeks of kitchen manufacture after the final survey. Thirty to forty six weeks from enquiry to a finished room is realistic.
Where to go next
Before committing to an extension, check whether a knock through gets you most of the benefit for a tenth of the cost. If the floor area genuinely is not there, extend, then bring the kitchen design in early enough that the two programmes overlap. Our Bespoke Kitchens North London page shows kitchens built into new side returns and rear extensions across North London.
More from this guide series
- How Much Does a New Kitchen Cost for the kitchen budget itself
- Does a New Kitchen Add Value to a House for the resale arithmetic
- How Long Does a Bespoke Kitchen Take for sequencing the two programmes
- What Is a Galley Kitchen for laying out a side return
- How to Plan a Bespoke Kitchen for the planning order
- Bespoke Kitchen Guides for every guide in the series
Send us your architect drawings and we will start the kitchen design while the builders are still on site.